Find jobs

News

The Crown Estate to Reveal Round 4 Tender Design in July

The Crown Estate is holding a market update event in July to present the finalized tender design for the fourth round of offshore wind leasing in the UK. The event, which will be held on 18 July in the afternoon, will focus on...

25/06/2019 Read

Merkur Switches On

GE Renewable Energy has completed the handover of the 66 GE Haliade 150-6MW turbines at the Merkur offshore wind farm in Germany. GE is also in charge of carrying out operations and maintenance of the turbines for a period of ten ye...

25/06/2019 Read

World's Longest Wind Turbine Blade Revealed

LM Wind Power in France has unveiled the world's longest wind turbine blade. The 107-meter (351-foot) blade will be used for GE's Haliade-X 12MW wind turbine, the world's most powerful to date. The Haliade-X 12 MW is a multi-million in...

25/06/2019 Read

Foundation Installation Begins at Formosa 1 Phase 2

Photo: COWI The installation of foundations has kicked off at the Formosa 1 Phase 2 offshore wind project in Taiwan. The installation began in early June, a spokesperson from COWI, who designed all the steelwork for the 20 monopiles and transit...

25/06/2019 Read

Damen successfully completed the First European conversion of a dredger to dual-fuel LNG / MGO at Dunkerque Ship repair yard

Photo: Damen Dual-fuel LNG/MGO propulsion Dredger 'Samuel de Champlain' straight away return to work for a 23 months contract. The 117 meter, 8,500m³ trailing suction hopper dredger Samuel de Champlain is owned by Rouen-b...

25/06/2019 Read

Leave your feedback